Life safety systems installation
EVC SystemsDry RisersSprinkler Interfaces

Other Life Safety Systems

Installation, testing and maintenance of Emergency Voice Communication (EVC) systems, dry risers and sprinkler interface coordination

Need assistance with your fire or security system?

Call our team on 020 3376 2672

Emergency call-out available

What We Do

Supporting critical life safety infrastructure beyond fire detection

Emergency Voice Communication (EVC)

Installation and maintenance of refuge and disabled refuge communication systems. Two-way communication between refuge points and a central control point for safe evacuation support.

  • Refuge point installation and testing
  • Master control panel configuration
  • Fire alarm system integration
  • Regular maintenance and certification

Dry Riser Testing & Maintenance

Annual and six-monthly testing of dry riser systems to BS 9990 standards. Ensuring firefighting water supply infrastructure is ready when needed most.

  • Pressure testing to BS 9990
  • Visual inspection of all components
  • Inlet and outlet valve servicing
  • Certification and compliance reporting

Sprinkler System Interfaces

Fire alarm integration with sprinkler systems. Coordination of flow switches, valve monitoring, and alarm signaling to ensure seamless operation.

  • Flow switch integration
  • Valve monitoring and supervision
  • Alarm panel coordination
  • Testing and commissioning

Installation & Project Coordination

New installations and system upgrades coordinated with other trades. Professional project management ensuring compliance and minimal disruption.

  • Site surveys and design
  • Multi-trade coordination
  • Professional installation
  • Handover documentation
Life Safety Systems

Typical Environments We Serve

Life safety systems are essential in buildings where evacuation may be complex or where firefighting infrastructure is required.

High-Rise Buildings

Dry risers and EVC systems

Healthcare Facilities

Refuge communication systems

Hotels & Hospitality

Multi-floor firefighting access

Shopping Centres

Sprinkler integration

Multi-Occupancy Buildings

Complex evacuation support

Public Buildings

Accessibility compliance

Educational Buildings

Student safety systems

Residential Care Homes

Assisted evacuation support

Legal Requirements & Compliance

Understanding your legal obligations for life safety systems

Building Regulations Approved Document B

Specifies requirements for means of escape, including provision for disabled people. EVC systems required in buildings with refuge areas.

EVC

Refuge communication

Access

Firefighting provisions

Testing

Regular maintenance

British Standards

Multiple standards govern the installation, testing and maintenance of life safety systems in commercial buildings.

BS 5839-9

EVC system design and installation

BS 9990

Dry riser testing and maintenance

BS 5839-1

Sprinkler interface requirements

Maintenance Requirements

Regular testing and maintenance schedules for life safety systems

Monthly
EVC Systems

EVC Functional Testing

Monthly testing of all refuge points to ensure clear two-way communication and proper operation of visual indicators.

Test all refuge points
Check audio quality
Verify visual indicators
Record results in logbook
6-Monthly
Dry Risers

Visual Inspection

Six-monthly visual inspection of dry riser installations to check for damage, corrosion, or unauthorized interference.

Inspect inlet and outlet valves
Check for physical damage
Verify signage and access
Document condition
Annual
Full Testing

Comprehensive Testing

Annual pressure testing of dry risers and full system verification of EVC and sprinkler interfaces with certification.

Dry riser pressure testing
EVC system certification
Interface functionality checks
Compliance documentation

Common Life Safety System Issues

Problems we regularly diagnose and resolve

EVC Communication Failures

Poor audio quality, failed handsets, or master panel faults. We diagnose wiring issues and replace faulty components.

Solution: Component replacement and wiring checks

Dry Riser Leaks

Failed pressure tests due to leaking valves or corroded pipework. We identify leak sources and carry out repairs or replacements.

Solution: Valve servicing and pipework repairs

Interface Integration Problems

Sprinkler flow switches not triggering fire alarms or valve monitoring failures. We verify wiring and program alarm panels correctly.

Solution: Interface testing and panel programming

Missing Documentation

Lack of test certificates, maintenance records, or as-built drawings. We provide comprehensive documentation and certification.

Solution: System survey and certification package

How We Work

Our structured approach ensures quality outcomes on every project

1

Initial Assessment

Site survey to assess your building's requirements for EVC systems, dry risers, or sprinkler interfaces. Review existing systems and documentation.

2

Design & Specification

Detailed design to relevant British Standards with clear quotation. Coordination with other trades where required.

3

Professional Installation

Installation by qualified engineers with full RAMS documentation. Minimal disruption to building operations.

4

Testing & Commissioning

Comprehensive testing to British Standards. Pressure testing for dry risers, functional testing for EVC systems.

5

Certification & Handover

Complete handover pack with test certificates, as-built drawings, and operation manuals. Staff training where applicable.

6

Ongoing Maintenance

Scheduled maintenance contracts to keep systems compliant. Regular testing and certification to British Standards.

Ensure Your Building's Life Safety Systems Are Compliant

Professional installation, testing and maintenance of EVC systems, dry risers and sprinkler interfaces across London and the South East

Speak to an Engineer Today – 020 3376 2672

BAFE SP203-1 Registered
Commercial experience
Certification & handover documentation

We use cookies

We use cookies to enhance your browsing experience and analyse our traffic. By clicking "Accept All", you consent to our use of cookies. Read our Privacy Policy for more information.